{"id":162,"date":"2017-03-31T21:56:59","date_gmt":"2017-03-31T21:56:59","guid":{"rendered":"http:\/\/www.harlemrivercrossways.com\/blog\/?p=162"},"modified":"2017-06-30T21:37:10","modified_gmt":"2017-06-30T21:37:10","slug":"adding-benchwork","status":"publish","type":"post","link":"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/","title":{"rendered":"Adding Benchwork"},"content":{"rendered":"<p>Having completed <a href=\"https:\/\/www.harlemrivercrossways.com\/blog\/building-the-outer-circular-track\/\">two sections of track work<\/a>, it is time to build the foundation for the tracks now. The first question I&nbsp;have to answer is, how to fit in the <a href=\"https:\/\/www.harlemrivercrossways.com\/blog\/a-place-and-a-time\/\">irregular quadrilateral<\/a> into&nbsp;a somehow rectangular shape. In other words, how much of the surroundings of the CNJ Bronx Terminal I would want to add on each side: Harlem River on the west&nbsp;side, Third Avenue Bridge on the north side, and Bruckner (formerly Southern) Boulevard and Lincoln Avenue on the East and South. The overall size should not exceed 4&#8243; x 3&#8243;. I decided to rotate the block slightly so that&nbsp;Third Avenue Bridge traverses from the left near&nbsp;to the left far&nbsp;corner and constitutes the left boundary of the layout while Lincoln Avenue provides the right boundary. This also leaves&nbsp;enough room for navigating the car floats on the Harlem River.<\/p>\n<p>For the benchwork I used 1.5&#8243; x 3\/4&#8243; studs for the frame and a 3\/16&#8243; birch plywood board. Screwed and glued, this would give me a very stable frame. The 1.5&#8243; room under the board is&nbsp;just about enough to protect the bracket-mounted servos I plan to&nbsp;use for switching the turnouts. The water level of the Harlem River would be 3\/4&#8243; lower than the freight yard. The water will add approximately 1\/8&#8243;, thus reducing the difference between water and pier. Since the ground cover, ballast and pavement would also add at least 1\/16&#8243;, I decided that this would be enough. Given the difference of about 6 ft between low and high tide in the Harlem River, the resulting height of the pier of more than 9 ft would be more than adequate.<\/p>\n<p>To seal the wooden surfaces, I used white acrylic primer. To facilitate detailed planning and testing, I marked the outline&nbsp;of the freight house&nbsp;with basswood. Finally, instead of adding legs to the layout, I built&nbsp;two wooden trestles strong enough to support everything. That way I&#8217;m flexible moving the layout around or stowing it away when space is scarce.<\/p>\n<div id='gallery-1' class='gallery galleryid-162 gallery-columns-3 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.harlemrivercrossways.com\/blog\/benchwork-1\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-1.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-1.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-1.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-1.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.harlemrivercrossways.com\/blog\/benchwork-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-2.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-2.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-2.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-2.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.harlemrivercrossways.com\/blog\/benchwork-3\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-3.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-3.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-3.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-3.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n<p>Having successfully set a stake in the ground, I was able to add my first two pieces of track work. It was about time &#8211; I found several issues &#8211; one more serious and a few minor ones &#8211; with the track plan. Specifically I found that my plan did not provide enough space for 4 tracks between the freight house and the bulkhead. I corrected this by re-designing the two turnouts leading to tracks 16 and 17. Going forward I&#8217;ll be able&nbsp;to validate every design step on the layout and avoid further mishaps.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Having completed two sections of track work, it is time to build the foundation for the tracks now. The first question I&nbsp;have to answer is, how to fit in the irregular quadrilateral into&nbsp;a somehow rectangular shape. In other words, how much of the surroundings of the CNJ Bronx Terminal I would want to add on [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"nf_dc_page":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ngg_post_thumbnail":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[3],"tags":[],"class_list":["post-162","post","type-post","status-publish","format-standard","hentry","category-layout"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Adding Benchwork &#8211; Harlem River Crossways<\/title>\n<meta name=\"description\" content=\"With two sections of track work completed, it is time to build the foundation for the tracks. The post explains how the construction of the benchwork.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Adding Benchwork &#8211; Harlem River Crossways\" \/>\n<meta property=\"og:description\" content=\"With two sections of track work completed, it is time to build the foundation for the tracks. The post explains how the construction of the benchwork.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/\" \/>\n<meta property=\"og:site_name\" content=\"Harlem River Crossways\" \/>\n<meta property=\"article:published_time\" content=\"2017-03-31T21:56:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-06-30T21:37:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-1.jpg?resize=150%2C150&amp;ssl=1\" \/>\n<meta name=\"author\" content=\"yardmaster\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"yardmaster\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/adding-benchwork\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/adding-benchwork\\\/\"},\"author\":{\"name\":\"yardmaster\",\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/#\\\/schema\\\/person\\\/df9374dc793021466c3d0092e31f7a6c\"},\"headline\":\"Adding Benchwork\",\"datePublished\":\"2017-03-31T21:56:59+00:00\",\"dateModified\":\"2017-06-30T21:37:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/adding-benchwork\\\/\"},\"wordCount\":438,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/#\\\/schema\\\/person\\\/df9374dc793021466c3d0092e31f7a6c\"},\"articleSection\":[\"Layout\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/adding-benchwork\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/adding-benchwork\\\/\",\"url\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/adding-benchwork\\\/\",\"name\":\"Adding Benchwork &#8211; Harlem River Crossways\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/#website\"},\"datePublished\":\"2017-03-31T21:56:59+00:00\",\"dateModified\":\"2017-06-30T21:37:10+00:00\",\"description\":\"With two sections of track work completed, it is time to build the foundation for the tracks. The post explains how the construction of the benchwork.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/adding-benchwork\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/adding-benchwork\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/adding-benchwork\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Adding Benchwork\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/\",\"name\":\"Harlem River Crossways\",\"description\":\"Prototypical Modeling in N Scale\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/#\\\/schema\\\/person\\\/df9374dc793021466c3d0092e31f7a6c\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Person\",\"Organization\"],\"@id\":\"https:\\\/\\\/www.harlemrivercrossways.com\\\/blog\\\/#\\\/schema\\\/person\\\/df9374dc793021466c3d0092e31f7a6c\",\"name\":\"yardmaster\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/47043df6a776e9acaf8678aba55dbf7656785339d21c52df444483f0c28f6eff?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/47043df6a776e9acaf8678aba55dbf7656785339d21c52df444483f0c28f6eff?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/47043df6a776e9acaf8678aba55dbf7656785339d21c52df444483f0c28f6eff?s=96&d=mm&r=g\",\"caption\":\"yardmaster\"},\"logo\":{\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/47043df6a776e9acaf8678aba55dbf7656785339d21c52df444483f0c28f6eff?s=96&d=mm&r=g\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Adding Benchwork &#8211; Harlem River Crossways","description":"With two sections of track work completed, it is time to build the foundation for the tracks. The post explains how the construction of the benchwork.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/","og_locale":"en_US","og_type":"article","og_title":"Adding Benchwork &#8211; Harlem River Crossways","og_description":"With two sections of track work completed, it is time to build the foundation for the tracks. The post explains how the construction of the benchwork.","og_url":"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/","og_site_name":"Harlem River Crossways","article_published_time":"2017-03-31T21:56:59+00:00","article_modified_time":"2017-06-30T21:37:10+00:00","og_image":[{"url":"https:\/\/i0.wp.com\/www.harlemrivercrossways.com\/blog\/wp-content\/uploads\/2017\/02\/Benchwork-1.jpg?resize=150%2C150&amp;ssl=1","type":"","width":"","height":""}],"author":"yardmaster","twitter_card":"summary_large_image","twitter_misc":{"Written by":"yardmaster","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/#article","isPartOf":{"@id":"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/"},"author":{"name":"yardmaster","@id":"https:\/\/www.harlemrivercrossways.com\/blog\/#\/schema\/person\/df9374dc793021466c3d0092e31f7a6c"},"headline":"Adding Benchwork","datePublished":"2017-03-31T21:56:59+00:00","dateModified":"2017-06-30T21:37:10+00:00","mainEntityOfPage":{"@id":"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/"},"wordCount":438,"commentCount":0,"publisher":{"@id":"https:\/\/www.harlemrivercrossways.com\/blog\/#\/schema\/person\/df9374dc793021466c3d0092e31f7a6c"},"articleSection":["Layout"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/","url":"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/","name":"Adding Benchwork &#8211; Harlem River Crossways","isPartOf":{"@id":"https:\/\/www.harlemrivercrossways.com\/blog\/#website"},"datePublished":"2017-03-31T21:56:59+00:00","dateModified":"2017-06-30T21:37:10+00:00","description":"With two sections of track work completed, it is time to build the foundation for the tracks. The post explains how the construction of the benchwork.","breadcrumb":{"@id":"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.harlemrivercrossways.com\/blog\/adding-benchwork\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.harlemrivercrossways.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Adding Benchwork"}]},{"@type":"WebSite","@id":"https:\/\/www.harlemrivercrossways.com\/blog\/#website","url":"https:\/\/www.harlemrivercrossways.com\/blog\/","name":"Harlem River Crossways","description":"Prototypical Modeling in N Scale","publisher":{"@id":"https:\/\/www.harlemrivercrossways.com\/blog\/#\/schema\/person\/df9374dc793021466c3d0092e31f7a6c"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.harlemrivercrossways.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Person","Organization"],"@id":"https:\/\/www.harlemrivercrossways.com\/blog\/#\/schema\/person\/df9374dc793021466c3d0092e31f7a6c","name":"yardmaster","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/47043df6a776e9acaf8678aba55dbf7656785339d21c52df444483f0c28f6eff?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/47043df6a776e9acaf8678aba55dbf7656785339d21c52df444483f0c28f6eff?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/47043df6a776e9acaf8678aba55dbf7656785339d21c52df444483f0c28f6eff?s=96&d=mm&r=g","caption":"yardmaster"},"logo":{"@id":"https:\/\/secure.gravatar.com\/avatar\/47043df6a776e9acaf8678aba55dbf7656785339d21c52df444483f0c28f6eff?s=96&d=mm&r=g"}}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.harlemrivercrossways.com\/blog\/wp-json\/wp\/v2\/posts\/162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.harlemrivercrossways.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.harlemrivercrossways.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.harlemrivercrossways.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.harlemrivercrossways.com\/blog\/wp-json\/wp\/v2\/comments?post=162"}],"version-history":[{"count":11,"href":"https:\/\/www.harlemrivercrossways.com\/blog\/wp-json\/wp\/v2\/posts\/162\/revisions"}],"predecessor-version":[{"id":684,"href":"https:\/\/www.harlemrivercrossways.com\/blog\/wp-json\/wp\/v2\/posts\/162\/revisions\/684"}],"wp:attachment":[{"href":"https:\/\/www.harlemrivercrossways.com\/blog\/wp-json\/wp\/v2\/media?parent=162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.harlemrivercrossways.com\/blog\/wp-json\/wp\/v2\/categories?post=162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.harlemrivercrossways.com\/blog\/wp-json\/wp\/v2\/tags?post=162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}